Preview:Vail Buzz is in early testing. Information may be wrong or out of date, so check the original source before you rely on it.
Preview: Vail Buzz is in early testing. Information may be wrong or out of date, so check the original source before you rely on it.
Loading…
  1. I-70: Between Exit 203: East Frisco (Silverthorne) and Exit 221: Bakerville (4 miles west of the Silver Plume area) from Mile Point 205 to Mile P…

    Between Exit 203: East Frisco (Silverthorne) and Exit 221: Bakerville (4 miles west of the Silver Plume area) from Mile Point 205 to Mile Point 221. Passenger vehicles that are all-wheel drive (AWD) or four-wheel drive (4WD) must have winter (Mountain Snowflake icon) or mud and snow (M+S or M/S) or manufacturer rated all-weather tires with adequate tread depth of at least 3/16 of an inch. Two-wheel drive (2WD) vehicles are required to have chains or an approved traction device.

  2. I-70: Between Exit 167: Avon and Exit 168: Post Boulevard (Avon) at Mile Point 168. Stalled vehicle.

  3. I-70 work zone: Between Exit 133: Dotsero (near Gypsum) and US 6 (near Eagle) from Mile Point 139 to Mile Point 147. Right lane closed …

    Between Exit 133: Dotsero (near Gypsum) and US 6 (near Eagle) from Mile Point 139 to Mile Point 147. Right lane closed due to paving operations. Width limit in effect. Width limit 11'0". Starting Tuesday at 7:00AM MST until Tuesday, at about 7:00PM MST. Full schedule below: • November 24, 7:00AM - November 24, 7:00PM Comment: Intermittent single lane closures, speed reduced to 55 mph and 10-20 minute delays. For more information email: resurfacingproject@gmail.com.

  4. I-70 work zone: Between Exit 133: Dotsero (near Gypsum) and US 6 (near Eagle) from Mile Point 139 to Mile Point 147. Right lane closed …

    Between Exit 133: Dotsero (near Gypsum) and US 6 (near Eagle) from Mile Point 139 to Mile Point 147. Right lane closed due to paving operations. Width limit in effect. Width limit 11'0". Starting Tuesday at 7:00AM MST until Tuesday, at about 7:00PM MST. Full schedule below: • November 24, 7:00AM - November 24, 7:00PM Comment: Intermittent single lane closures, speed reduced to 55 mph and 10-20 minute delays. For more information email: resurfacingproject@gmail.com.

  5. Vail Mountain Opens for the 2026/27 Winter Season

    The best way to experience Colorado’s largest mountain is with an Epic Pass - prices go up after Nov. 15

  6. Vail Turns Up the Volume, Unveils First Wave of Artists for Its Biggest Music Season Yet

  7. Alpine Adventures Await: Vail Resorts Unveils Summer 2026 Season Dates in Colorado and Utah

    Epic Pass Holders Unlock Summer Perks Including Scenic Lift Access and 20% Savings on Dining, Lodging, Bike Rentals and Golf

  8. Vail Mountain Names Shaydar Edelmann Vice President and Chief Operating Officer

  9. Beth Howard Announces Retirement After 41 Years With Vail Resorts